Client : SP PowerGrid Ltd. Completion : October 2005 Location : Senoko Power Station to Gambas Ave
Tunnel (TBM) : ID 3.5m, L=3.4km Deep Shafts : 3 Locations H=28m to 55m Associated buildings and M&E works